After a period of inactivity of over six years, Italcementi decided to reconvert and reactivate the cement plant situated in Sarche di Calvino (TN), in response to the increase in demand for cement. A new central control room - designed by Gruppo SET and furnished by Bosco - aims to:
The new control center features a graduated 2500XL series Control Console that adapts perfectly to the walls and accommodates 6 operators. In the final version, the customer chose to accessorise the control stations with a rack channel under the work surface, to allow the electronic equipment to be housed while leaving the operators' legs free.
The large graduated control console overlooks a Video Wall 1000Base made up of six 55" monitors, which form a single, fully configurable surface. The Videowall is equipped with cabinets that allow the accommodation of electronic equipment ( for the acquisition of images from IP cameras or systems such as SCADA, Milestone etc...) or even the 19" Rack fixing.